Friday, 1 May 2015

New Workshop - Rendered speechless

Just another quick end of the week progress report on the workshop.  I am really surprised how much things have progressed this week things have really moved along. The soffits and fascias have been installed and the rendering has been completed which was no small feat considering the weather has not been great.  We didn't get the guttering up but all in all things have moved on nicely.

Things will slow down now as I am waiting for the concrete floor to be poured and the drainage installed which the contractor can't fit in until the end of the month.  Once that done the doors can be fitted and we will be about done other than the fit out .





1 comment:

  1. Cryptocurrency lovers could make their deposits and receive their winnings by way of BTC, Bitcoin Cash, ETH, Litecoin, ChainLink, Dogecoin, Tether, Ripple, Stellar, and USDC. As we’d count on here, crypto payouts are fee-free and processed within 1 hour. On the intense facet, we didn’t notice any lag 카지노 사이트 when scrolling by way of and wagering on their money traces. Depositing and withdrawing our cryptocurrency with one click was also simpler than we expected it to be.

    ReplyDelete