Just a quick progress report on the workshop / garage build. Yesterday morningI sat around waiting for the lintel to support the masonry above the segmented up and over door to arrive (it was meant to arrive Friday, but it finally turned up Saturday morning).

So as we stand all the walls are up to eight foot high and the lintel is in above the pedestrian door and the lintel for the garage door is ready and waiting.  Next week we will hopefully get the second lintel in place, build the gable walls up to ridge height and get the ridge beam installed.  If we get everything done and the materials arrive in time works out we will be framing the roof over the Easter break.